NortelOtherCertification 920-362

VUE/Prometric Code: 920-362

Exam: Notel 920-362

Ver:V8.02
Q&A:60 Q&As

업그레이트:2010-07-13
 
NortelOtherCertification 920-362 문제는 시험문제의 변화에 따라 업데이트가 될것입니다.시험문제가 매번 바뀐 후, 2일내에 시험문제 920-362 를 수정하여 다시 조정함으로서920-362:Notel 920-362가 시험문제의 점유률을 항상 96% 이상으로 확보합니다.
 
실제시험문제보기:
7. At a customer site, you installed a Communication Server (CS) 1000 Rls. 6.0 SA Co-Res system with
the following CS 1000 applications. Call Server, Signaling Server, Element Manager, Network Routing
Service Manager, and Subscriber Manager. Upon accessing Subscriber Manager, information regarding
the System ID is displayed on the screen and you're not able to navigate the Subscriber Manager web
page. Which task is required next before you can navigate and manage the Subscriber Manager
Application?
A.Copy and Paste the system ID information and create a new Subscriber Manager certificate within the
UCM Private Certificate Authority.
B.Copy and Paste the system ID information to the Nortel.com Keycode Retrieval System to generate a
license file.
C.Export the system ID as an XML file and distribute the file to the CS 1000 Element Managers as a
trusted application.
D.Export the system ID as an XML file and synchronize the file information with the customer's LDAP
server.
Answer:B
8. From which two parts is the Fully Qualified Domain Name (FQDN) composed and in what order must
they be configured?
A.first the host name and then the domain name
B.first the domain name and then the host name
C.first the COTS server IP address and then the port number
D.first the COTS server port number and then the IP address
Answer:A
9. A Communication Server (CS) 1000E Rls. 6.0 customer site has both Signaling Server Gateway and
SIP Line Gateway up communicating with the CS 1000 Call Server Which statement is true regarding the
configuration similarities between the Signaling Server Gateway and SIP Line Gateway?
A.They each load-balance the registration of IP telephones.
B.They both require separate Zone-based configuration for codec selection.
C.They both use virtual TNs.
D.They each require Application Module Link configuration.
Answer:C
10. A customer with a Communication Server (CS) 1000E Rls. 6.0 SA Co-Res system is experiencing an
Element Manager issue where the page cannot be displayed to the users. In order to resolve this problem
you decide to reboot the Element Manager. The CPPM Co-Res server has the following deployed
applications. Call Server, Signaling Server, Element Manager, and Network Routing Service. Which
option allows for the least service interruption when restarting the Signaling Server application?
A.Restart the Signaling Server application via Element Manager - Maintenance.
B.Restart the Signaling Server application by pressing the INI button on the CPPM server.
C.Restart the Signaling Server application by pressing the RST button on the CPPM server.
D.Restart the Signaling Server application by logging into the Base Manager and restarting Jboss.
Answer:A
 
 
  • Articles related:

Post comment:

◎welcome to give out your point。

Calendar

Comments

Previous

Powered By Z-Blog 1.8 Arwen Build 81206

Copyright xxxx-xxxx Your WebSite. Some Rights Reserved.